How to cut a concrete floor for new plumbing.
Patching concrete floor after rough plumbing.
The pictures below see next post are how the contractor left the work.
This is part of a bathroom remodeling project.
Vinyl concrete patch repair quikrete 40 lb.
Wait at least 24 hours before walking on the patch and a week before driving on it.
The cooler the weather the longer the curing time.
How to repair a hole in concrete floor in this video renos does a floor repair on a concrete floor.
Just prior to the contractor ending work his plumbing and electrical subs had passed their rough inspections then his demo guy covered up the work in preparation for patching the slab.
The temperature of the existing concrete must remain above 50 degrees for the first 24 to 48 hours after the patch is applied.
It has strong adhesive properties allowing it to be applied down to a featheredge.
Well the contractor walked mid job so i ll be gc ing after all.
Vinyl concrete patcher is quikrete 40 lb.
For a texture pull a damp push broom over the concrete.
During new construction the builder installs drain lines and stubs that will connect to future plumbing fixtures before he pours the slab on grade.