Contact roofhelp 12 24 nailing pattern for roofing felt each row of nails that are 24 on center should be approximately 12 from the outside edge of the roll.
Nailing pattern for roof felt.
Installing roof felt is a two person job.
Anchor the top corner of the felt after it has been properly positioned and roll the felt out across the roof.
Nail the middle and bottom of the felt similarly.
Most of the time you ll need to contact a local building inspector directly to get a definite answer if it s not already written out for you on the blueprints or manufacturers specifications.
Pick up the roll with both hands.
Contact roofhelp 9 18 nailing pattern for roofing felt each row of nails that are 18 on center should be approximately 12 from the outside edge of the roll.
This video walks through the very basic steps for installing tarpaper felt.
The paper should then be nailed in or stapled every three to four inches across.
All nails and staples should be placed on the lower half of the paper.
Pull straighten and align the felt along the eaves.
Where a roll ends and a new one is begun the two rolls should be overlapped by four inches.
Space each nail apart by about 30 to 36 inches 76 to 91 cm along the side of the felt closest to the roof s peak and 12 inch 30 5 cm along the side closest to the ground.
I like to give them a call about any new nailing schedules that i m uncertain about.
Roof rafters to ridge valley 2 16d common end nail.
Nail metal drip edge flashing which bends over the roof and down the edge of the facing board on all roof edges.
Pay careful attention to roll the felt out smoothly avoiding wrinkles as you move across the roof.
Starting a roof with tarpaper felt.
From behind the roll reach over and nail down the top of the strip with roofing nails spaced 6 to 8 inches apart.
Be sure that there are no wrinkles.
X research source small sheds usually require about 100 to 150 clout nails.
Rafter or roof truss to top plate table and section 2308 7 5 3 10 common 316d box 410d box 43 x0 131 nails 4 3 14 gage staples 7 16 crown toenail c 7.
This way i don t get chewed out by the building inspector when they show up to inspect that particular.
Fasten drip edge on eaves with.
Valley ridges and hips should have a 6 inch overlap of paper.
The top edge of the felt should be nailed no less than every eight inches.