There will also be kooltherm k7 pitched roof board between the rafters image credit.
My roof doesnt have boards under the tile.
What is the rule on the deck of a roof.
This can generate mold that can be hazardous to humans and animals.
It is also used for the prevention of draughts and dust penetration into the roof spaces through tiles and slates and prevents damage to ceilings rotting of timbers and corrosion of plumbing.
I have an 11 sq.
There is one chimney no valleys 8 12 pitch and 30 linear ft.
Should the plywood be replaced along with the shingles.
Old concrete roof tile replacements photo by rangerx istock.
Cement board also provides an additional layer over a plywood or particleboard subfloor adding stiffness to the tile.
It was installed in 1929 to replace the original cedar shakes and has weathered hurricanes like a champ.
I just had my roof re done but there are areas where the roof sags as if the old plywood wasn t replaced.
Water under a tile floor can be caused by a various number of things.
Depending on how bad the felt is i e.
I have a question about the deck part of your roof.
Kingspan with a warm roof the usual process is to split the insulation into two layers.
Under tile sheeting is placed under the roof tiles ensuring a perfect proofing membrane for all elements which affect housings and developments.
Knowing if you do have water underneath tile is important.
If it is that trades people on the roof over the years have put their feet through the felt small patches can be inserted in a v shape to the width of the trusses and stapled to the roof trusses internally over the lower strip and under the upper strip.
This is a distinct advantage over plywood and drywall.
Of fascia that needs to be replaced as well.
I have lost count of the number of times i have had someone out to look at the roof and i ve spent hundreds of pounds in repair bills.
It s currently leaking and i called my insurance company and received a claim.
The roof tiles have all been inspected and any that were cracked or chipped replaced the ridge tiles have been repointed the mortar on the side of the roof has been repaired were necessary and there aren t any slipped or missing tiles or anything else untoward.
It can also cause damage to the subfloor or wood underneath the tile.
If 180mm is to be installed then 100mm board might be introduced between the rafters there has to be a minimum 25mm air gap between the insulation and the underside of the tiles or slates with an 80mm board running.
Cement board is a type of underlayment that is now standard for most tile installations but particularly for floor tile.
My house is a 97 year old victorian with a concrete tile roof.